SOCAR talks progress of Baku Oil Refinery's modernization
![SOCAR talks progress of Baku Oil Refinery's modernization SOCAR talks progress of Baku Oil Refinery's modernization](https://anews.az/photo/850x500/2019-06/1561016293_trend_npz_oil_plant_211113_3.jpg)
The 2nd and 3rd stages of the modernization project of the Baku Oil Refinery named after Heydar Aliyev are currently being implemented in parallel, the Azerbaijani state-owned company SOCAR told Trend.
It was noted that the new bitumen plant was commissioned during the 1st stage of the project and is already fully functional.
The unit produces bitumen in volumes corresponding to the demand in the domestic market.
At present, modernization work is being carried out at the Baku Oil Refinery named after Heydar Aliyev, set to be completed by 2021. After modernization, the refinery’s production capacity will be increased from 6 million tons to 8 million tons annually, and the operating life of the enterprise will be prolonged till 2040.
The current oil refining unit (ELOU AVT) at the refinery was built in 1976.
www.anews.az
Similar news
Similar news
![Undersecretary of State: Poland, Azerbaijan eye to improve market access conditions for entrepreneurs (Exclusive) Undersecretary of State: Poland, Azerbaijan eye to improve market access conditions for entrepreneurs (Exclusive)](https://anews.az/photo/300x250/2019-09/1568009808_azerbaijan_poland_flags_261112.jpg)
Business
12:18
Undersecretary of State: Poland, Azerbaijan eye to improve market access conditions for entrepreneurs (Exclusive)
![Petrofac and SOCAR JV secures engineering and technical services contract in Azerbaijan Petrofac and SOCAR JV secures engineering and technical services contract in Azerbaijan](https://anews.az/photo/300x250/2019-08/1566212578_bp_shimal_absheron_oil_rig_050219.jpg)
Business
12:04
Petrofac and SOCAR JV secures engineering and technical services contract in Azerbaijan