The gas transportation systems of Armenia and Azerbaijan were connected to each other through the following main gas pipelines: Gazakh-Yerevan, with a diameter of 1,000 mm, 6 km subject to restoration; Sharur-Yerevan, with a diameter of 700 mm, 22 km are subject to restoration; Goris-Nakhchivan, with a diameter of 700 mm, 16.5 km are subject to restoration.
www.anews.az
Follow us !