• $
  • £

TAP due to start excavation phase to connect two sections

TAP due to start excavation phase to connect two sections
18.01.2019 11:07
TAP AG, the consortium for construction of the Trans Adriatic Pipeline (TAP), will soon start excavation phase that will allow connecting the part of the gas pipeline that arrives by sea from Albania with the short stretch on land in Italy, Trend reports citing a message from the consortium.

The final part of this connection, about 1.5 kilometers long, will be realized using the micro-tunnel technology, said the message.

"The excavation will be carried out at 16 meters below the beach and therefore there will be no interference with what is happening on the surface, nor will there be any limitation of access to those areas for citizens,” the consortium said.

TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union (EU). The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania, and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

The project is currently in its construction phase, which started in 2016.

Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3,500-kilometer long gas value chain stretching from the Caspian Sea to Europe.

TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).



www.anews.az
Similar news
Similar news
Azerbaijan helps prepare ITF Transport Outlook 2027
Business 18:00
Azerbaijan helps prepare ITF Transport Outlook 2027
ADY food product shipments rise 35% in H1
Business 17:30
ADY food product shipments rise 35% in H1
Georgia brings energy agreements with Azerbaijan into force
Business 17:00
Georgia brings energy agreements with Azerbaijan into force
Azerbaijan’s green power output reaches 2.8 bln kWh in H1
Business 16:00
Azerbaijan’s green power output reaches 2.8 bln kWh in H1
Azerbaijan produced 13.3 mln tonnes of oil in H1
Business 15:30
Azerbaijan produced 13.3 mln tonnes of oil in H1
Azeri Light oil price rises above $88
Business 15:00
Azeri Light oil price rises above $88
Euro money once again names ABB Bank “Bank of the Year”
Business 13:30
Euro money once again names ABB Bank “Bank of the Year”
Respublika Recognised by Euromoney as Azerbaijan's Best Bank for SMEs
Business 13:00
Respublika Recognised by Euromoney as Azerbaijan's Best Bank for SMEs
Online business loans of up to 300,000 manats with no collateral and no bank visits!
Business 12:43
Online business loans of up to 300,000 manats with no collateral and no bank visits!
Anews TV

Our official Youtube channel

Subscribe